Your cart is empty.
Your cart is empty.Placeholder
2025-09-06 10:39:03
Get it ! Works well !
Nat
2025-09-03 17:01:06
We have Australian shepherd that weighs about 60 pounds. She has not been able to pull it up from the ground.Very well made.
JK
2025-08-19 18:56:00
The tie out is solid. It holds our two 60 pound hiskies with no issues; until, this past week when one of our dogs met me in the driveway with the tie out in tow. The cable ( purchased in November ), had snapped letting him loose. I'd hoped for a little more durability out of that and now have to purchase a new cable.
tlf
2025-05-28 10:12:08
I bought this for a visit with a friend who doesn't have a fenced yard. It was easy to get into the ground, and the 20 ft length gave my small dog enough leeway to move around.
Heather Lofflin
2025-05-06 19:11:39
There are a lot of choices out there, so I just sort of picked one based on the color and the price. I picked a good one. I've been using this to keep a 10-pound dog in the yard that has a brand new privacy fence -- she managed to find her way out three days after it was built. It will, however, catch on anything that gets in its way, but I imagine all other cables do the same thing. Easy to install and use. Good, sturdy quality. Would recommend.
Carolyn Gerson
2025-04-25 13:32:59
Got new fencing and had to figure out a way to keep my dog safe for a few days. So I ordered this, and it worked great
dean
2025-04-21 15:06:56
A definite must have if you just got a puppy or you got a regular sized dog that needs to be taken out and left outside for long periods of time screw it in the ground it goes in the ground very easily everything that The seller side is true about it it's really good product try it
Customer
2025-03-28 10:32:25
This is supposed to be for small dogs but the piece you hook to the dogs collar is too heavy. The dog is scared of it
Manon L.
2025-03-23 14:40:29
Parfait ! Solide et joli en plus
terra
2025-03-04 16:59:18
Bought for my dog who gets a scent in her nose and roams. I am going up north and needed to keep my dog at hands reach. works great leash is not to long but long enough for me. thank you
The Baker’s
2025-02-04 16:40:44
We’ve had no issues with this. Very happy with it.
Maurice
2025-01-14 18:07:22
Works good
Richard Micallef
2024-12-29 16:45:30
Great durable product.
Recommended Products